The table below describes the specifications and material standards for utility and process connections required for installation of the High Efficiency Stillage Concentration system.
HESC™ Installation Requirements
Utility and Process Connections
| Description | Tie Point | Size | Specification |
|---|---|---|---|
Stillage feedstock |
1 |
3" |
304L SS, Schedule 10S |
Product syrup |
2 |
2" |
304L SS, Schedule 10S |
Distillate |
3 |
2" |
304L SS, Schedule 10S |
Vent |
4 |
2" |
304L SS, Schedule 10S |
Drain header |
5 |
3" |
304L SS, Schedule 10S |
Steam (for startup) |
6 |
2" |
Carbon steel, Schedule 40 |
Cooling water supply |
7 |
3" |
Carbon steel, Schedule 40 |
Cooling water return |
8 |
3" |
Carbon steel, Schedule 40 |
Instrument air supply |
9 |
1" |
304L SS, Schedule 10S |
Clean domestic water |
10 |
1" |
304L SS, Schedule 10S |
Medium voltage power |
- |
- |
4160V/60Hz/3-phase, 200A service |
Low voltage power |
- |
- |
480V/60Hz/3-phase, 450A service |
Single phase power |
- |
- |
115V/60Hz/1-phase. 3-20A feeders |